首頁最新消息簡介攝影畫廊讀經日引網上資源網上下載網上討論區聯絡我們
聖經金句

耶和華啊,我的心仰望你。
詩篇:25-1



 
聖經查詢
聖經查詢(新版)
關於我們
目錄導覽
音樂詩歌點播
文化天地
時事論壇
世界經濟
育博通
珠璣集
幽默
News
教育中心
Century Tribune 時代論壇报
山行文化出版社
文藝園地
健康資訊
中美友好協會
美國新聞 ( 国际日报 报道)
南粵之窗
Amazing Qingdao
Panda Mania
教會機構專欄精選
網上奉獻與支持
故障申告
聯絡我們
網站維護

設為首頁
加入「我的最愛」
瀏覽流量統計
人數: 2,988,652 
頁數: 34,857,812 
下載: 14,170 
Since 11/2005


訂閱電子報

訂閱電子週報
自訂閱名單移除
電郵Email:



  
   

Bookmark and Share   
 
Tunnel section of China-Myanmar railway drilled through in Yunnan
 
 Tunnel section of China-Myanmar railway drilled through in Yunnan  .
 
7/11/2020




The Hongdoushan Tunnel, a key tunnel project of the Dali-Lincang Railway, was successfully drilled through on Wednesday in southwest China's Yunnan Province after the four-year construction work.

Construction on the 10.6 km Hongdoushan Tunnel started in May 2016. However, toxic gases were detected in the tunnel in May 2017, which, in combination with extremely high temperatures and the gushing water, increased the construction difficulties.

The complex geological environmental conditions of the Hongdoushan Tunnel that allow various toxic gases to gather are very rare, according to experts.

Factors such as high geothermal, ground stress and seismic intensity, active neotectonic movement, geothermal environment, external dynamic geological function and superficial geological transformation have all contributed to the large number of types of toxic gases in high concentrations.

Under such circumstances, the project's construction contractor worked with universities and institutes to solve the problem, and the construction had proceeded steadily.

"After conquering four major difficulties in four years, 1,200 of our staff members finally gained the hard-won victory on construction of the Hongdoushan Tunnel. At present, all the over-10-kilometer tunnels of the Dali-Lincang Railway have been drilled through. And we are confident that the remaining works can be completed on schedule in mid-October," said Zhao Yu, manager of the Dali-Lincang railway project department of the Railway No. 10 Engineering Group Co., Ltd.

The Dali-Lincang Railway, with a length of 202 km and a designed speed of 160 km per hour, is a key section of the China-Myanmar international railway. It is scheduled to be completed and open to traffic by the end of 2020.

相關訊息

Patricks dream life in Yunnan 
 

Spring City popular among tourists to relieve summer heat 
 

The scene of "dragon sucking water" in China, appeared on Erhai Lake in Dali of Yunnan  
 

Abozuo: An ecological Yi village 
 

World's seventh-largest hydropower station starts operating 
 

Zip lines assume new role in Nujiang's poverty relief 
 

Flower tourism blossoms in Yunnan 
 

Summer nightlife festival opens in downtown Kunming 
 

Yunnan is listed on the top 10 provinces and municipalities in terms of tourist enthusiasm for domestic travel 
 

Yunnan welcomes nesting weaverbirds 
 

Dali-Lincang Railway in Yunnan tunneled through 
 

Spider lilies in full bloom in Yunnan 
 

Main structure of super bridge on China-Laos railway completes in Yunnan 
 

In pics: living environment improves in east Yunnan 
 

Art to dye for 
 

本目錄中最多閱覽的文章

Video - The kitty, the yard, the hamlet: See today's Shangri-La 


Kunming: An ideal place for mountain biking 


The 2017 Yunnan Cultural Industry Expo kicked off in Kunming 
The Expo gathers traditional handicrafts, cultural and creative products as well as technological products from 1270 enterprises at home and abroad.

視頻:雲南麗江市西北部有一個地方可以觸摸星空 
在這堙A你有機會體驗壯麗的丹霞地貌,冰川湖泊,森林,高山草甸,自然的美麗難以形容。

Video: Eastern #Valentine’s Day in Lanping, Yunnan 
For Pumi people living in Lanping Bai and Pumi Autonomous County, in northwest #Yunnan’s Nujiang Lisu Autonomous Prefecture, May 30 is not only the Chinese traditional Dragon-boat Festival, but also the annual local Valentine’s Day.

   Email: sino.american2020@gmail.com    Powered by Web4Jesus (W4J) Ministry